IS WORK OVER?

Automation index

How much of a Luthier’s job can AI already do?

A soundboard mould comes earlier. Gluing, tensioning and the instrument sounding do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Luthier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Template, woods and the soundboard mould.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Glue, braces and the one that opens.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
String, fret and the octave.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Finish, the bridge and the one that will not hold.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The player, the concert and not moving the soundpost blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it sounds, and not leaving a twisted neck.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • glue soundboards
  • braces
  • fret
  • octaves
  • bridges
  • soundpost
  • woods
  • guitar moulds

Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Analyse my job

Jobs with similar scores

  1. 611Restaurant maître19%
  2. 612Judge19%
  3. 613Speech therapist19%
  4. 615Workshop teacher19%
  5. 616Dressmaker19%
  6. 617Camp counsellor19%