Automation index
How much of a Luthier’s job can AI already do?
A soundboard mould comes earlier. Gluing, tensioning and the instrument sounding do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Luthier
19%
AI can already do 19% of this job.
#518 / 643
View rankingLuthier
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Template, woods and the soundboard mould.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Glue, braces and the one that opens.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
String, fret and the octave.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Finish, the bridge and the one that will not hold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The player, the concert and not moving the soundpost blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it sounds, and not leaving a twisted neck.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- glue soundboards
- braces
- fret
- octaves
- bridges
- soundpost
- woods
- guitar moulds
Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312
IS WORK OVER?
Hydraulic engineer
27%
#166 / 643
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142