IS WORK OVER?

Automation index

How much of a Luthier’s job can AI already do?

A soundboard mould comes earlier. Gluing, tensioning and the instrument sounding do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Luthier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Template, woods and the soundboard mould.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Glue, braces and the one that opens.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
String, fret and the octave.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Finish, the bridge and the one that will not hold.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The player, the concert and not moving the soundpost blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it sounds, and not leaving a twisted neck.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • glue soundboards
  • braces
  • fret
  • octaves
  • bridges
  • soundpost
  • woods
  • guitar moulds

Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 515Restaurant maître19%
  2. 516Judge19%
  3. 517Speech therapist19%
  4. 519Workshop teacher19%
  5. 520Dressmaker19%
  6. 521Camp counsellor19%