Automation index
How much of a Luthier’s job can AI already do?
A soundboard mould comes earlier. Gluing, tensioning and the instrument sounding do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Luthier
19%
AI can already do 19% of this job.
#606 / 743
View rankingLuthier
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Template, woods and the soundboard mould.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Glue, braces and the one that opens.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
String, fret and the octave.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Finish, the bridge and the one that will not hold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The player, the concert and not moving the soundpost blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it sounds, and not leaving a twisted neck.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- glue soundboards
- braces
- fret
- octaves
- bridges
- soundpost
- woods
- guitar moulds
Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142