Automation index
How much of a Luthier’s job can AI already do?
A soundboard mould comes earlier. Gluing, tensioning and the instrument sounding do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Luthier
19%
AI can already do 19% of this job.
#614 / 753
View rankingLuthier
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Template, woods and the soundboard mould.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Glue, braces and the one that opens.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
String, fret and the octave.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Finish, the bridge and the one that will not hold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The player, the concert and not moving the soundpost blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it sounds, and not leaving a twisted neck.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- glue soundboards
- braces
- fret
- octaves
- bridges
- soundpost
- woods
- guitar moulds
Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312
IS WORK OVER?
Site engineer
19%
#606 / 753
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142