Automation index
How much of a Luthier’s job can AI already do?
A soundboard mould comes earlier. Gluing, tensioning and the instrument sounding do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Luthier
19%
AI can already do 19% of this job.
#508 / 633
View rankingLuthier
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Template, woods and the soundboard mould.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Glue, braces and the one that opens.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
String, fret and the octave.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Finish, the bridge and the one that will not hold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The player, the concert and not moving the soundpost blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it sounds, and not leaving a twisted neck.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- glue soundboards
- braces
- fret
- octaves
- bridges
- soundpost
- woods
- guitar moulds
Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312
IS WORK OVER?
Telecom engineer
25%
#235 / 633
View rankingTelecom engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Size, simulate and plan radio and fibre.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Projects, permits and sites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Field, measurements and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Incidents, NOC and operators.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, spectrum and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a town dark from a mistake.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Size, simulate and plan radio and fibre
- Projects, permits and sites
- Field, measurements and commissioning
- Incidents, NOC and operators
- Rules, spectrum and documentation
- Not leaving a town dark from a mistake
- ingeniero de telecomunicaciones
- telecom engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2153