IS WORK OVER?

Automation index

How much of a Maintenance technician’s job can AI already do?

A CMMS and a procedure come earlier. Hearing a bearing, and leaving the plant running, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Maintenance technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, history and spare orders.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Procedures, written LOTO and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Diagnose, strip and repair.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Field preventative and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
On-call, shutdowns and production pressure.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Safety, permits and not leaving the plant down.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS, history and spare orders
  • Procedures, written LOTO and logs
  • Diagnose, strip and repair
  • Field preventative and measurements
  • On-call, shutdowns and production pressure
  • tecnico de mantenimiento
  • maintenance technician
  • mantenimiento industrial

Sources for this job· O*NET 49-9041.00· ESCO/ISCO 3115

Acoustics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reading, the map and the standard.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the insulation and what was not put in.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Simulation, the model and not trusting it alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the neighbour and not softening the dB.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The council, the licence and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Bring it down for real, and not selling the miracle panel.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • noise maps
  • insulation
  • dB
  • acoustic simulations
  • standards
  • licences
  • neighbours
  • field readings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 466NDT technician22%
  2. 467Pharmacy technician22%
  3. 468Fibre technician22%
  4. 470Environmental technician22%
  5. 471Metrology technician22%
  6. 472Waste technician22%