IS WORK OVER?

Automation index

How much of a Maintenance technician’s job can AI already do?

A CMMS and a procedure come earlier. Hearing a bearing, and leaving the plant running, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Maintenance technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, history and spare orders.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Procedures, written LOTO and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Diagnose, strip and repair.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Field preventative and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
On-call, shutdowns and production pressure.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Safety, permits and not leaving the plant down.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS, history and spare orders
  • Procedures, written LOTO and logs
  • Diagnose, strip and repair
  • Field preventative and measurements
  • On-call, shutdowns and production pressure
  • tecnico de mantenimiento
  • maintenance technician
  • mantenimiento industrial

Sources for this job· O*NET 49-9041.00· ESCO/ISCO 3115

CAD designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimensions and the drawing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clash, the hit and not leaving it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
List, the material and the one that does not exist.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the revision and not losing the native.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shop, the doubt and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be made, and not leaving the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 3D models
  • dimensions
  • clashes
  • bills of materials
  • revisions
  • shop drawings
  • natives
  • hits

Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 473NDT technician22%
  2. 474Pharmacy technician22%
  3. 475Fibre technician22%
  4. 477Environmental technician22%
  5. 478Metrology technician22%
  6. 479Waste technician22%