IS WORK OVER?

Automation index

How much of a Maintenance technician’s job can AI already do?

A CMMS and a procedure come earlier. Hearing a bearing, and leaving the plant running, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Maintenance technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, history and spare orders.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Procedures, written LOTO and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Diagnose, strip and repair.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Field preventative and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
On-call, shutdowns and production pressure.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Safety, permits and not leaving the plant down.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS, history and spare orders
  • Procedures, written LOTO and logs
  • Diagnose, strip and repair
  • Field preventative and measurements
  • On-call, shutdowns and production pressure
  • tecnico de mantenimiento
  • maintenance technician
  • mantenimiento industrial

Sources for this job· O*NET 49-9041.00· ESCO/ISCO 3115

Formwork carpenter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Build, plumb and brace the formwork.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Pour, vibrate and strike.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, crane and job safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a column crooked.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Read drawings, measure and order sheet
  • Build, plumb and brace the formwork
  • Pour, vibrate and strike
  • Site, crane and job safety
  • Logs, quantities and extras
  • Not leaving a column crooked
  • encofrador
  • formwork

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Analyse my job

Jobs with similar scores

  1. 386NDT technician22%
  2. 387Pharmacy technician22%
  3. 388Fibre technician22%
  4. 390Environmental technician22%
  5. 391Metrology technician22%
  6. 392Waste technician22%