IS WORK OVER?

Automation index

How much of a Maintenance technician’s job can AI already do?

A CMMS and a procedure come earlier. Hearing a bearing, and leaving the plant running, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Maintenance technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, history and spare orders.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Procedures, written LOTO and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Diagnose, strip and repair.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Field preventative and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
On-call, shutdowns and production pressure.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Safety, permits and not leaving the plant down.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS, history and spare orders
  • Procedures, written LOTO and logs
  • Diagnose, strip and repair
  • Field preventative and measurements
  • On-call, shutdowns and production pressure
  • tecnico de mantenimiento
  • maintenance technician
  • mantenimiento industrial

Sources for this job· O*NET 49-9041.00· ESCO/ISCO 3115

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 458NDT technician22%
  2. 459Pharmacy technician22%
  3. 460Fibre technician22%
  4. 462Environmental technician22%
  5. 463Metrology technician22%
  6. 464Waste technician22%