IS WORK OVER?

Automation index

How much of a Maintenance technician’s job can AI already do?

A CMMS and a procedure come earlier. Hearing a bearing, and leaving the plant running, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Maintenance technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, history and spare orders.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Procedures, written LOTO and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Diagnose, strip and repair.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Field preventative and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
On-call, shutdowns and production pressure.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Safety, permits and not leaving the plant down.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS, history and spare orders
  • Procedures, written LOTO and logs
  • Diagnose, strip and repair
  • Field preventative and measurements
  • On-call, shutdowns and production pressure
  • tecnico de mantenimiento
  • maintenance technician
  • mantenimiento industrial

Sources for this job· O*NET 49-9041.00· ESCO/ISCO 3115

Insulation installer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, thicknesses and the panel list.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Fit, seal and the bridge you leave.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Roof, façade and the wind on the scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Barriers, vapour and condensation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The designer, the change and late material.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No bridge, and not crushing the insulation.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit insulation
  • thermal bridges
  • vapour barrier
  • thicknesses
  • insulated façade
  • condensation
  • seal panels
  • roof

Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124

Analyse my job

Jobs with similar scores

  1. 395NDT technician22%
  2. 396Pharmacy technician22%
  3. 397Fibre technician22%
  4. 399Environmental technician22%
  5. 400Metrology technician22%
  6. 401Waste technician22%