IS WORK OVER?

Automation index

How much of a Maintenance technician’s job can AI already do?

A CMMS and a procedure come earlier. Hearing a bearing, and leaving the plant running, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Maintenance technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, history and spare orders.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Procedures, written LOTO and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Diagnose, strip and repair.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Field preventative and measurements.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
On-call, shutdowns and production pressure.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Safety, permits and not leaving the plant down.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS, history and spare orders
  • Procedures, written LOTO and logs
  • Diagnose, strip and repair
  • Field preventative and measurements
  • On-call, shutdowns and production pressure
  • tecnico de mantenimiento
  • maintenance technician
  • mantenimiento industrial

Sources for this job· O*NET 49-9041.00· ESCO/ISCO 3115

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 458NDT technician22%
  2. 459Pharmacy technician22%
  3. 460Fibre technician22%
  4. 462Environmental technician22%
  5. 463Metrology technician22%
  6. 464Waste technician22%