Automation index
How much of a Maintenance technician’s job can AI already do?
A CMMS and a procedure come earlier. Hearing a bearing, and leaving the plant running, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Maintenance technician
22%
AI can already do 22% of this job.
#398 / 643
View rankingMaintenance technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, history and spare orders.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Procedures, written LOTO and logs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Diagnose, strip and repair.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Field preventative and measurements.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
On-call, shutdowns and production pressure.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Safety, permits and not leaving the plant down.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS, history and spare orders
- Procedures, written LOTO and logs
- Diagnose, strip and repair
- Field preventative and measurements
- On-call, shutdowns and production pressure
- tecnico de mantenimiento
- maintenance technician
- mantenimiento industrial
Sources for this job· O*NET 49-9041.00· ESCO/ISCO 3115
IS WORK OVER?
Wind-turbine technician
19%
#546 / 643
View rankingWind-turbine technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SCADA, the code and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, the wind and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Nacelle, the oil and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rescue, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the access and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and the turbine running.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm SCADA
- climb the tower
- nacelle
- height rescue
- oils
- fault codes
- access
- wind
Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412