Automation index
How much of a Marine engineer’s job can AI already do?
An engine log comes earlier. The engine lasting the crossing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Marine engineer
21%
AI can already do 21% of this job.
#506 / 733
View rankingMarine engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Rounds, parameters and the engine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Breakdown, the sea and repairing with what you have.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Fuel, oils and the port change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Watch, alarms and the one who does not sleep.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Survey, class and not dressing the log.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Last the crossing, and not silencing the alarm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- engine rounds
- engine log
- breakdowns at sea
- watches
- class
- fuels
- engine-room alarms
- repair on passage
Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142