IS WORK OVER?

Automation index

How much of a Marine engineer’s job can AI already do?

An engine log comes earlier. The engine lasting the crossing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Marine engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Rounds, parameters and the engine log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Breakdown, the sea and repairing with what you have.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fuel, oils and the port change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Watch, alarms and the one who does not sleep.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Survey, class and not dressing the log.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Last the crossing, and not silencing the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • engine rounds
  • engine log
  • breakdowns at sea
  • watches
  • class
  • fuels
  • engine-room alarms
  • repair on passage

Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151

Furniture assembler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Manual, fittings and the parts count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Assemble, plumb and the wrong screw.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Up the stairs without marking the wall.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Adjust doors, drawers and the client watching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The small flat and the piece that will not fit whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not wobble, and not leaving a fitting out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • assemble furniture
  • fittings
  • plumb wardrobes
  • adjust doors
  • drawers
  • up the stairs
  • parts count
  • screws

Sources for this job· O*NET 51-2092.00· ESCO/ISCO 8219

Analyse my job

Jobs with similar scores

  1. 433Waterproofer21%
  2. 434Solar installer21%
  3. 435Train conductor21%
  4. 437Mediator21%
  5. 438Musician21%
  6. 439Court officer21%