Automation index
How much of a Marine engineer’s job can AI already do?
An engine log comes earlier. The engine lasting the crossing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Marine engineer
21%
AI can already do 21% of this job.
#436 / 643
View rankingMarine engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Rounds, parameters and the engine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Breakdown, the sea and repairing with what you have.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Fuel, oils and the port change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Watch, alarms and the one who does not sleep.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Survey, class and not dressing the log.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Last the crossing, and not silencing the alarm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- engine rounds
- engine log
- breakdowns at sea
- watches
- class
- fuels
- engine-room alarms
- repair on passage
Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151
IS WORK OVER?
Milliner
19%
#543 / 643
View rankingMilliner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Block, crown and the material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Shape, stitch and the brim that will not sit.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fit, the hair and the one that will not take a pin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Trim, feather and the balance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The wedding, the wind and not making a prop hat.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it sits, and does not fly.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hat blocks
- crowns
- brims
- feathers
- pins
- fit hats
- trim
- balance
Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7531