IS WORK OVER?

Automation index

How much of a Marine engineer’s job can AI already do?

An engine log comes earlier. The engine lasting the crossing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Marine engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Rounds, parameters and the engine log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Breakdown, the sea and repairing with what you have.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fuel, oils and the port change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Watch, alarms and the one who does not sleep.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Survey, class and not dressing the log.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Last the crossing, and not silencing the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • engine rounds
  • engine log
  • breakdowns at sea
  • watches
  • class
  • fuels
  • engine-room alarms
  • repair on passage

Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151

Pizza maker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Dough, ferment and the day’s point.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Open, top and the oven at a thousand.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Serve, delivery and the one that arrives cold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
List, costs and the topping that runs out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Saturday, the queue and not working too far ahead.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Pull it in time, and not leaving it carbonised.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • open dough
  • bake pizza
  • ferment
  • top pizzas
  • the oven
  • pizza delivery
  • dough point
  • Saturday queue

Sources for this job· O*NET 35-2011.00· ESCO/ISCO 5120

Analyse my job

Jobs with similar scores

  1. 433Waterproofer21%
  2. 434Solar installer21%
  3. 435Train conductor21%
  4. 437Mediator21%
  5. 438Musician21%
  6. 439Court officer21%