IS WORK OVER?

Automation index

How much of a Marine engineer’s job can AI already do?

An engine log comes earlier. The engine lasting the crossing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Marine engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Rounds, parameters and the engine log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Breakdown, the sea and repairing with what you have.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fuel, oils and the port change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Watch, alarms and the one who does not sleep.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Survey, class and not dressing the log.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Last the crossing, and not silencing the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • engine rounds
  • engine log
  • breakdowns at sea
  • watches
  • class
  • fuels
  • engine-room alarms
  • repair on passage

Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151

Small-hydro technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, set-point and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Turbine, the bearing and the one that sounds.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Gate, the jam and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Low flow, the river and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The flood, the spill and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it spins, and not dry.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turbinable flow
  • bearings
  • gates
  • low flow
  • spills
  • small hydro
  • turbine logs
  • jams

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 433Waterproofer21%
  2. 434Solar installer21%
  3. 435Train conductor21%
  4. 437Mediator21%
  5. 438Musician21%
  6. 439Court officer21%