Automation index
How much of a Marine engineer’s job can AI already do?
An engine log comes earlier. The engine lasting the crossing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Marine engineer
21%
AI can already do 21% of this job.
#436 / 643
View rankingMarine engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Rounds, parameters and the engine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Breakdown, the sea and repairing with what you have.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Fuel, oils and the port change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Watch, alarms and the one who does not sleep.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Survey, class and not dressing the log.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Last the crossing, and not silencing the alarm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- engine rounds
- engine log
- breakdowns at sea
- watches
- class
- fuels
- engine-room alarms
- repair on passage
Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151
IS WORK OVER?
Tram driver
19%
#496 / 643
View rankingTram driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checks, log and the cab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, stops and the pedestrian who steps out.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Badly parked car, calls and Control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Timetable, reliefs and rush hour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The tourist, the bike and not over-hooting.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Hit nobody, and make the terminus.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive trams
- urban stops
- pedestrians
- badly parked cars
- Control
- rush hour
- cab checks
- terminus
Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311