IS WORK OVER?

Automation index

How much of a Mason’s job can AI already do?

Measuring and ordering materials can move earlier. Raising a plumb wall, in the rain, next to a journeyman, cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Actuary

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Run models, reserves and sensitivities.
Estimate

No public source provides a precise figure. This is our estimate.

24%55%+13.2
Draft technical reports and memos.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Choose assumptions, tables and criteria.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Explain to the board and the supervisor.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Validate data quality and bias.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Signed opinion and professional liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%18%+2.2
Total100%32%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Run models, reserves and sensitivities
  • Draft technical reports and memos
  • Choose assumptions, tables and criteria
  • Explain to the board and the supervisor
  • Validate data quality and bias
  • Signed opinion and professional liability
  • actuario
  • actuary

Sources for this job· O*NET 15-2011.00· ESCO/ISCO 2120

Analyse my job

Jobs with similar scores

  1. 624Flight attendant16%
  2. 625Security guard16%
  3. 626Plasterer16%
  4. 628Referee15%
  5. 629Locksmith15%
  6. 630Bus driver15%