IS WORK OVER?

Automation index

How much of a Mason’s job can AI already do?

Measuring and ordering materials can move earlier. Raising a plumb wall, in the rain, next to a journeyman, cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Astronomer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Proposal, time and the instrument.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Observe, calibrate and the one that clouds over.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Reduce, the pipeline and the artefact.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Paper, the referee and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The facility, the queue and not losing the night.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Reduce, and not selling the find early.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • telescope time
  • calibrate
  • pipelines
  • papers
  • artefacts
  • nights
  • proposals
  • instruments

Sources for this job· O*NET 19-2011.00· ESCO/ISCO 2111

Analyse my job

Jobs with similar scores

  1. 624Flight attendant16%
  2. 625Security guard16%
  3. 626Plasterer16%
  4. 628Referee15%
  5. 629Locksmith15%
  6. 630Bus driver15%