IS WORK OVER?

Automation index

Can AI do the work of a Mason?

Measuring and ordering materials can move earlier. Raising a plumb wall, in the rain, next to a journeyman, cannot.

It also does not predict how many people will lose their jobs.

Task comparison

IS WORK OVER?

Mason

15%

AI or a robot can already do 15% of this job.

#98 / 103

View ranking

Mason

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Read drawings, measure and order material.
Estimate

No public source pins this saving. It is an estimate of the method.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source pins this saving. It is an estimate of the method.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source pins this saving. It is an estimate of the method.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source pins this saving. It is an estimate of the method.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source pins this saving. It is an estimate of the method.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source pins this saving. It is an estimate of the method.

14%15%+2.1
Total100%15%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Database administrator

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Tuning, indexes and execution plans.
Estimate

No public source pins this saving. It is an estimate of the method.

22%48%+10.6
Backups, jobs and docs.
Estimate

No public source pins this saving. It is an estimate of the method.

18%42%+7.6
Incidents, locks and restores.
Estimate

No public source pins this saving. It is an estimate of the method.

16%20%+3.2
Schema changes with development.
Estimate

No public source pins this saving. It is an estimate of the method.

16%15%+2.4
Permissions, audit and PII.
Estimate

No public source pins this saving. It is an estimate of the method.

14%18%+2.5
Capacity, cost and engine choice.
Estimate

No public source pins this saving. It is an estimate of the method.

14%16%+2.2
Total100%28%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • Tuning, indexes and execution plans
  • Backups, jobs and docs
  • Incidents, locks and restores
  • Schema changes with development
  • Permissions, audit and PII
  • Capacity, cost and engine choice
  • dba
  • administrador de base de datos
  • oracle dba

Sources for this job· O*NET 15-1242.00· ESCO/ISCO 2521

Analyse my job

Nearby in the ranking

  1. 95Actor17%
  2. 96Police officer17%
  3. 97Caregiver16%
  4. 99Surgeon14%
  5. 100Hairdresser14%
  6. 101Paramedic14%