IS WORK OVER?

Automation index

How much of a Mason’s job can AI already do?

Measuring and ordering materials can move earlier. Raising a plumb wall, in the rain, next to a journeyman, cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Health and safety officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Risk assessments, PPE and procedures.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Safety plans, coordination and minutes.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site or plant visit, stop unsafe work.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Train, investigate accidents and propose measures.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Labour inspectorate, mutual and activity coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Judgement, sign-off and preventive liability.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • assess workplace risk
  • write safety plans
  • stop unsafe work
  • investigate accidents
  • deliver H&S training
  • coordinate contractors
  • choose PPE
  • safety minutes

Sources for this job· O*NET 19-5011.00· ESCO/ISCO 2263

Analyse my job

Jobs with similar scores

  1. 624Flight attendant16%
  2. 625Security guard16%
  3. 626Plasterer16%
  4. 628Referee15%
  5. 629Locksmith15%
  6. 630Bus driver15%