IS WORK OVER?

Automation index

How much of a Mason’s job can AI already do?

Measuring and ordering materials can move earlier. Raising a plumb wall, in the rain, next to a journeyman, cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Quality engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
FMEA, control plan and the limits.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
8D, claims and the supplier.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Audit, IATF and the awkward finding.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the defect and stop or not.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
APQP, PPAP and the customer launch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Release with judgement, and not hiding the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • FMEA
  • 8D
  • control plan
  • IATF
  • PPAP
  • APQP
  • supplier claims
  • release batches

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 624Flight attendant16%
  2. 625Security guard16%
  3. 626Plasterer16%
  4. 628Referee15%
  5. 629Locksmith15%
  6. 630Bus driver15%