IS WORK OVER?

Automation index

How much of a Mason’s job can AI already do?

Measuring and ordering materials can move earlier. Raising a plumb wall, in the rain, next to a journeyman, cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Risk manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, models and risk reporting.
Estimate

No public source provides a precise figure. This is our estimate.

22%52%+11.4
Policies, limits and stress tests.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Escalate an incident and talk to desks.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Committee, exceptions and negotiation.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Data quality and model assumptions.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Stop the risk and sign the opinion.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%29%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Maps, models and risk reporting
  • Policies, limits and stress tests
  • Escalate an incident and talk to desks
  • Committee, exceptions and negotiation
  • Data quality and model assumptions
  • Stop the risk and sign the opinion
  • risk manager
  • gestor de riesgos
  • riesgo operacional

Sources for this job· O*NET 13-2099.02· ESCO/ISCO 2413

Analyse my job

Jobs with similar scores

  1. 624Flight attendant16%
  2. 625Security guard16%
  3. 626Plasterer16%
  4. 628Referee15%
  5. 629Locksmith15%
  6. 630Bus driver15%