IS WORK OVER?

Automation index

How much of a Mason’s job can AI already do?

Measuring and ordering materials can move earlier. Raising a plumb wall, in the rain, next to a journeyman, cannot.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 634Flight attendant16%
  2. 635Security guard16%
  3. 636Plasterer16%
  4. 638Referee15%
  5. 639Locksmith15%
  6. 640Bus driver15%