Automation index
How much of a Materials engineer’s job can AI already do?
A tensile curve comes earlier. Picking the alloy so it does not fail in service do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Materials engineer
27%
AI can already do 27% of this job.
#162 / 623
View rankingMaterials engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tests, metallography and the spec.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, heat treatment and the part that fails spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material choice, corrosion and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, certificates and the doubtful batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The field failure and the root cause.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not fail, and not swapping the material blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- materials tests
- metallography
- choose alloys
- corrosion
- fatigue
- heat treatment
- failure analysis
- batch certificates
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2149
IS WORK OVER?
Book editor
25%
#220 / 623
View rankingBook editor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Readers’ reports, selection and rejection.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Work the text with the author: structure and tone.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
P&L, advances, contracts and the schedule.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coordinate copy-edit, layout, cover and press.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
List, bookshops and the life of the title.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The editorial bet and owning the book.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- edit books
- readers’ reports
- work manuscripts
- negotiate advances
- build the list
- coordinate layout
- choose the cover
- get it into shops
Sources for this job· O*NET 27-3041.00· ESCO/ISCO 2641