IS WORK OVER?

Automation index

How much of a Materials engineer’s job can AI already do?

A tensile curve comes earlier. Picking the alloy so it does not fail in service do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Materials engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tests, metallography and the spec.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shop, heat treatment and the part that fails spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material choice, corrosion and fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, certificates and the doubtful batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The field failure and the root cause.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not fail, and not swapping the material blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • materials tests
  • metallography
  • choose alloys
  • corrosion
  • fatigue
  • heat treatment
  • failure analysis
  • batch certificates

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2149

Chemist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocols, calcs and safety sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Batch reports, charts and docs.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Synthesis, titration and sample handling.
Estimate

No public source provides a precise figure. This is our estimate.

18%15%+2.7
Read a strange result and repeat it.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Plant safety and waste.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Sign quality and talk to production.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Protocols, calcs and safety sheets
  • Batch reports, charts and docs
  • Synthesis, titration and sample handling
  • Read a strange result and repeat it
  • Plant safety and waste
  • Sign quality and talk to production
  • quimico
  • chemist
  • laboratorio quimico

Sources for this job· O*NET 19-2031.00· ESCO/ISCO 2113

Analyse my job

Jobs with similar scores

  1. 159Automation engineer27%
  2. 160Energy engineer27%
  3. 161Packaging engineer27%
  4. 163Renewables engineer27%
  5. 164Hydraulic engineer27%
  6. 165Textile engineer27%