Automation index
How much of a Materials engineer’s job can AI already do?
A tensile curve comes earlier. Picking the alloy so it does not fail in service do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Materials engineer
27%
AI can already do 27% of this job.
#162 / 623
View rankingMaterials engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tests, metallography and the spec.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, heat treatment and the part that fails spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material choice, corrosion and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, certificates and the doubtful batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The field failure and the root cause.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not fail, and not swapping the material blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- materials tests
- metallography
- choose alloys
- corrosion
- fatigue
- heat treatment
- failure analysis
- batch certificates
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2149
IS WORK OVER?
Kayak guide
19%
#492 / 623
View rankingKayak guide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, kit and the briefing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Water, the novice and the one who flips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Rescue, the rope and not losing anyone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rapid, the yes or no and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The cold, the wetsuit and not pushing the grade.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Without flipping the group, and whole to the take-out.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- flow
- river rescue
- rapids
- wetsuit
- kayak novices
- rope
- river briefing
- flip
Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113