Automation index
How much of a Materials engineer’s job can AI already do?
A tensile curve comes earlier. Picking the alloy so it does not fail in service do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Materials engineer
27%
AI can already do 27% of this job.
#162 / 623
View rankingMaterials engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tests, metallography and the spec.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, heat treatment and the part that fails spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material choice, corrosion and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, certificates and the doubtful batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The field failure and the root cause.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not fail, and not swapping the material blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- materials tests
- metallography
- choose alloys
- corrosion
- fatigue
- heat treatment
- failure analysis
- batch certificates
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2149
IS WORK OVER?
Locksmith
15%
#609 / 623
View rankingLocksmith
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Emergency diary, quotes and invoices.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Diagnose lock, cylinder and possible pick.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Opening, cylinder swap and fitting.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Fit electronic locks and access control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Cut keys and manage master systems.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Helping a client in trouble, and travel.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 18% | +2.2 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Emergency diary, quotes and invoices
- Diagnose lock, cylinder and possible pick
- Opening, cylinder swap and fitting
- Fit electronic locks and access control
- Cut keys and manage master systems
- Helping a client in trouble, and travel
- cerrajer
- locksmith
- apertura de puertas
Sources for this job· O*NET 49-9094.00· ESCO/ISCO 7222