IS WORK OVER?

Automation index

How much of a Materials engineer’s job can AI already do?

A tensile curve comes earlier. Picking the alloy so it does not fail in service do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Materials engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tests, metallography and the spec.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shop, heat treatment and the part that fails spec.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Material choice, corrosion and fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supplier, certificates and the doubtful batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The field failure and the root cause.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not fail, and not swapping the material blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • materials tests
  • metallography
  • choose alloys
  • corrosion
  • fatigue
  • heat treatment
  • failure analysis
  • batch certificates

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2149

Risk manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, models and risk reporting.
Estimate

No public source provides a precise figure. This is our estimate.

22%52%+11.4
Policies, limits and stress tests.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Escalate an incident and talk to desks.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Committee, exceptions and negotiation.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Data quality and model assumptions.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Stop the risk and sign the opinion.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%29%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Maps, models and risk reporting
  • Policies, limits and stress tests
  • Escalate an incident and talk to desks
  • Committee, exceptions and negotiation
  • Data quality and model assumptions
  • Stop the risk and sign the opinion
  • risk manager
  • gestor de riesgos
  • riesgo operacional

Sources for this job· O*NET 13-2099.02· ESCO/ISCO 2413

Analyse my job

Jobs with similar scores

  1. 159Automation engineer27%
  2. 160Energy engineer27%
  3. 161Packaging engineer27%
  4. 163Renewables engineer27%
  5. 164Hydraulic engineer27%
  6. 165Textile engineer27%