Automation index
How much of a Materials engineer’s job can AI already do?
A tensile curve comes earlier. Picking the alloy so it does not fail in service do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Materials engineer
27%
AI can already do 27% of this job.
#162 / 623
View rankingMaterials engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tests, metallography and the spec.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, heat treatment and the part that fails spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material choice, corrosion and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, certificates and the doubtful batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The field failure and the root cause.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not fail, and not swapping the material blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- materials tests
- metallography
- choose alloys
- corrosion
- fatigue
- heat treatment
- failure analysis
- batch certificates
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2149
IS WORK OVER?
Tow-truck driver
20%
#439 / 623
View rankingTow-truck driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Call, route and the vehicle type.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Hard shoulder, hook and traffic that will not stop.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Hydraulics, bed and the low car that scrapes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Garage, the note and the client who argues.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Night, rain and not becoming the next crash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not making the crash worse, and signing the hook.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hook vehicles
- hard shoulder
- the bed
- recovery calls
- crane hydraulics
- recovery notes
- traffic
- low cars
Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332