Automation index
How much of a Materials engineer’s job can AI already do?
A tensile curve comes earlier. Picking the alloy so it does not fail in service do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Materials engineer
27%
AI can already do 27% of this job.
#162 / 623
View rankingMaterials engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tests, metallography and the spec.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shop, heat treatment and the part that fails spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Material choice, corrosion and fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supplier, certificates and the doubtful batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The field failure and the root cause.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not fail, and not swapping the material blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- materials tests
- metallography
- choose alloys
- corrosion
- fatigue
- heat treatment
- failure analysis
- batch certificates
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2149
IS WORK OVER?
Wall tiler
19%
#471 / 623
View rankingWall tiler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, level and the tile format.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Adhesive, set and the tray fall.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cut, drill and the tile that splits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grout, seal and the bath junction.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the model change and the stock that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No ugly cut, and no leak.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tile walls
- set out joints
- bed tiles
- tray fall
- seal junctions
- cut tiles
- drill tile
- grout
Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122