Automation index
How much of a Maths teacher’s job can AI already do?
A worksheet comes earlier. Them understanding the problem without copying the answer do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Maths teacher
22%
AI can already do 22% of this job.
#434 / 733
View rankingMaths teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, the worksheet and the typical error.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Board, the silence and the one who is lost.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Exam, the markscheme and not giving the pass away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Resit, the one who quits and not leaving them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The family, 'I was bad at it too', and not shutting the door.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they understand, and not copying the answer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- maths worksheets
- the board
- typical errors
- maths exams
- resits
- markscheme
- algebra
- problems
Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142