Automation index
How much of a Maxillofacial prosthetist’s job can AI already do?
A mould comes earlier. The prosthesis looking like the face and staying on do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Maxillofacial prosthetist
19%
AI can already do 19% of this job.
#633 / 743
View rankingMaxillofacial prosthetist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Mould, measures and the colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Design, the anchorage and the one that will not seal.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Fitting, the look and the one who does not recognise themselves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Finish, the silicone and the edge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The surgeon, the deadline and not rushing a bad colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it looks like them, and stays on.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- facial moulds
- anchorage
- silicone
- skin colour
- ocular prostheses
- edges
- prosthesis fittings
- not rush the colour
Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142