Automation index
How much of a Maxillofacial surgeon’s job can AI already do?
A 3D osteotomy plan comes earlier. Cutting the jaw and getting the bite to fit do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Maxillofacial surgeon
21%
AI can already do 21% of this job.
#489 / 733
View rankingMaxillofacial surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
3D plan, splints and consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Osteotomies, facial trauma and implants.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cyst, impacted wisdom tooth and the joint.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Post-op, occlusion and the face that swells.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Head and neck oncology with the board.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Facial emergencies and signing the bone that moves.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- osteotomy
- facial trauma
- zygomatic implants
- impacted wisdom teeth
- occlusion
- 3D maxillofacial plan
- jaw cysts
- head and neck
Sources for this job· O*NET 29-1022.00· ESCO/ISCO 2261
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142