Automation index
How much of a Maxillofacial surgeon’s job can AI already do?
A 3D osteotomy plan comes earlier. Cutting the jaw and getting the bite to fit do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Maxillofacial surgeon
21%
AI can already do 21% of this job.
#410 / 633
View rankingMaxillofacial surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
3D plan, splints and consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Osteotomies, facial trauma and implants.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cyst, impacted wisdom tooth and the joint.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Post-op, occlusion and the face that swells.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Head and neck oncology with the board.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Facial emergencies and signing the bone that moves.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- osteotomy
- facial trauma
- zygomatic implants
- impacted wisdom teeth
- occlusion
- 3D maxillofacial plan
- jaw cysts
- head and neck
Sources for this job· O*NET 29-1022.00· ESCO/ISCO 2261
IS WORK OVER?
Crane operator
16%
#605 / 633
View rankingCrane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Lift plan, radii and weights.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Run the crane and place the load.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Signals, wind and exclusion zone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, foreman and maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, inspections and machine tests.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a load over someone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Lift plan, radii and weights
- Run the crane and place the load
- Signals, wind and exclusion zone
- Site, foreman and maintenance
- Logs, inspections and machine tests
- Not leaving a load over someone
- gruista
- operador de grua
- crane operator
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343