IS WORK OVER?

Automation index

How much of a Maxillofacial surgeon’s job can AI already do?

A 3D osteotomy plan comes earlier. Cutting the jaw and getting the bite to fit do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Maxillofacial surgeon

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
3D plan, splints and consent.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Osteotomies, facial trauma and implants.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cyst, impacted wisdom tooth and the joint.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Post-op, occlusion and the face that swells.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Head and neck oncology with the board.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Facial emergencies and signing the bone that moves.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • osteotomy
  • facial trauma
  • zygomatic implants
  • impacted wisdom teeth
  • occlusion
  • 3D maxillofacial plan
  • jaw cysts
  • head and neck

Sources for this job· O*NET 29-1022.00· ESCO/ISCO 2261

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 407Beekeeper21%
  2. 408Aluminium carpenter21%
  3. 409Pork butcher21%
  4. 411Composer21%
  5. 412Mixer-truck driver21%
  6. 413Animal breeder21%