IS WORK OVER?

Automation index

How much of a Mechanical engineer’s job can AI already do?

A calculation and a model come earlier. Signing a shaft that will not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechanical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, model and simulate parts and assemblies.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and bills of materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Meetings with shop, client and purchasing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tests, prototypes and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rules, quality and CE documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Sign, register and own the design.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Meetings with shop, client and purchasing
  • Tests, prototypes and commissioning
  • Rules, quality and CE documentation
  • Sign, register and own the design
  • ingeniero mecanico
  • mechanical engineer

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Commissioning engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, the loop and the punch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, start-up and the one that is not ready.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Test, the trip and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Vendors, the one who does not come and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Start up, and not leaving the interlock jumped.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test protocols
  • loops
  • punch list
  • start-up
  • trips
  • vendors
  • interlocks
  • not sign half done

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 270Electrical engineer25%
  2. 271Electronics engineer25%
  3. 272Geological engineer25%
  4. 274Naval architect25%
  5. 275Chemical engineer25%
  6. 276Interior designer25%