IS WORK OVER?

Automation index

How much of a Mechanical engineer’s job can AI already do?

A calculation and a model come earlier. Signing a shaft that will not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechanical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, model and simulate parts and assemblies.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and bills of materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Meetings with shop, client and purchasing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tests, prototypes and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rules, quality and CE documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Sign, register and own the design.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Meetings with shop, client and purchasing
  • Tests, prototypes and commissioning
  • Rules, quality and CE documentation
  • Sign, register and own the design
  • ingeniero mecanico
  • mechanical engineer

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Court interpreter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Glossary, the case and the language.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Court, the oath and the one who stumbles.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cells, the statement and not softening it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Document, the translation and the stamp.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Counsel, the rush and not jumping a meaning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Say what was said, and not what suited.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • court glossaries
  • court interpreting
  • statements
  • the oath
  • sworn translation
  • cells
  • not soften
  • stamps

Sources for this job· O*NET 27-3091.00· ESCO/ISCO 2643

Analyse my job

Jobs with similar scores

  1. 260Electrical engineer25%
  2. 261Electronics engineer25%
  3. 262Geological engineer25%
  4. 264Naval architect25%
  5. 265Chemical engineer25%
  6. 266Interior designer25%