IS WORK OVER?

Automation index

How much of a Mechanical engineer’s job can AI already do?

A calculation and a model come earlier. Signing a shaft that will not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechanical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, model and simulate parts and assemblies.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and bills of materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Meetings with shop, client and purchasing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tests, prototypes and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rules, quality and CE documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Sign, register and own the design.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Meetings with shop, client and purchasing
  • Tests, prototypes and commissioning
  • Rules, quality and CE documentation
  • Sign, register and own the design
  • ingeniero mecanico
  • mechanical engineer

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Family therapist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Genogram, the brief and the frame.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Session, the one who speaks for all and the one who stays quiet.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Conflict, the boundary and not taking sides.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The child, the loyalty and not using them as messenger.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The referral, the risk and calling it in time.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they stay, and not taking sides.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • genogram
  • family frame
  • joint sessions
  • loyalties
  • not take sides
  • child-risk
  • refer
  • boundaries

Sources for this job· O*NET 21-1013.00· ESCO/ISCO 2635

Analyse my job

Jobs with similar scores

  1. 242Electrical engineer25%
  2. 243Electronics engineer25%
  3. 244Geological engineer25%
  4. 246Naval architect25%
  5. 247Chemical engineer25%
  6. 248Interior designer25%