IS WORK OVER?

Automation index

How much of a Mechanical engineer’s job can AI already do?

A calculation and a model come earlier. Signing a shaft that will not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechanical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, model and simulate parts and assemblies.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and bills of materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Meetings with shop, client and purchasing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tests, prototypes and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rules, quality and CE documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Sign, register and own the design.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Meetings with shop, client and purchasing
  • Tests, prototypes and commissioning
  • Rules, quality and CE documentation
  • Sign, register and own the design
  • ingeniero mecanico
  • mechanical engineer

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Nursery grower

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sow, water and the calendar.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Glasshouse, pest and the batch that turns.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Order, the garden centre and the plant that is not ready.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Substrate, feed and the one that drowns.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The heat, the shade and not selling too early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Saleable, and not drowning the rootball.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • nursery sowing
  • glasshouse
  • rootball
  • plant pests
  • garden centre
  • substrate
  • watering calendar
  • shade

Sources for this job· O*NET 45-2092.00· ESCO/ISCO 6113

Analyse my job

Jobs with similar scores

  1. 236Electrical engineer25%
  2. 237Electronics engineer25%
  3. 238Geological engineer25%
  4. 240Naval architect25%
  5. 241Chemical engineer25%
  6. 242Interior designer25%