IS WORK OVER?

Automation index

How much of a Mechanical engineer’s job can AI already do?

A calculation and a model come earlier. Signing a shaft that will not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechanical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, model and simulate parts and assemblies.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and bills of materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Meetings with shop, client and purchasing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tests, prototypes and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rules, quality and CE documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Sign, register and own the design.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Meetings with shop, client and purchasing
  • Tests, prototypes and commissioning
  • Rules, quality and CE documentation
  • Sign, register and own the design
  • ingeniero mecanico
  • mechanical engineer

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 272Electrical engineer25%
  2. 273Electronics engineer25%
  3. 274Geological engineer25%
  4. 276Naval architect25%
  5. 277Chemical engineer25%
  6. 278Interior designer25%