IS WORK OVER?

Automation index

How much of a Mechanical engineer’s job can AI already do?

A calculation and a model come earlier. Signing a shaft that will not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechanical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, model and simulate parts and assemblies.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and bills of materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Meetings with shop, client and purchasing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tests, prototypes and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rules, quality and CE documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Sign, register and own the design.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Meetings with shop, client and purchasing
  • Tests, prototypes and commissioning
  • Rules, quality and CE documentation
  • Sign, register and own the design
  • ingeniero mecanico
  • mechanical engineer

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Requirements engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Workshop, the actor and the requirement.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Conflict, the loudest and not swallowing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Criterion, the test and not leaving it vague.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the impact and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The project lead, the deadline and not cutting the one that matters.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is needed, and not the loudest one's.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • requirements
  • actor workshops
  • acceptance criteria
  • change impact
  • backlog
  • tests
  • not swallow the loudest
  • ambiguity

Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 275Electrical engineer25%
  2. 276Electronics engineer25%
  3. 277Geological engineer25%
  4. 279Naval architect25%
  5. 280Chemical engineer25%
  6. 281Interior designer25%