IS WORK OVER?

Automation index

How much of a Mechanical engineer’s job can AI already do?

A calculation and a model come earlier. Signing a shaft that will not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechanical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, model and simulate parts and assemblies.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and bills of materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Meetings with shop, client and purchasing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tests, prototypes and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rules, quality and CE documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Sign, register and own the design.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Meetings with shop, client and purchasing
  • Tests, prototypes and commissioning
  • Rules, quality and CE documentation
  • Sign, register and own the design
  • ingeniero mecanico
  • mechanical engineer

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Social integrator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Pathways, reports and case coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Go along in the street, the flat and the missed appointment.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Network, resources and fighting for a place.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Group, conflict and the one who walks out.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Family, social services and the note to the judge.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The bond, and the case not falling over.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • social support
  • insertion pathways
  • mediate conflict
  • refer to services
  • street work
  • social reports
  • coordinate cases
  • group workshops

Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635

Analyse my job

Jobs with similar scores

  1. 236Electrical engineer25%
  2. 237Electronics engineer25%
  3. 238Geological engineer25%
  4. 240Naval architect25%
  5. 241Chemical engineer25%
  6. 242Interior designer25%