IS WORK OVER?

Automation index

How much of a Mechatronics engineer’s job can AI already do?

A schematic comes earlier. The arm not taking a finger, and actually starting, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechatronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, the PLC and the loop.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the arm and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Commissioning, the interlock and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cycle, the time and not inflating the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the guard and not leaving them blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not take a finger, and starts.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PLC
  • loops
  • robot cells
  • interlocks
  • commissioning
  • guards
  • cycle times
  • not jump the interlock

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 390Corrosion engineer22%
  2. 391Instrumentation engineer22%
  3. 392Facilities engineer22%
  4. 394Mining engineer22%
  5. 395Bridge engineer22%
  6. 396Commissioning engineer22%