IS WORK OVER?

Automation index

How much of a Mechatronics engineer’s job can AI already do?

A schematic comes earlier. The arm not taking a finger, and actually starting, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechatronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, the PLC and the loop.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the arm and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Commissioning, the interlock and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cycle, the time and not inflating the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the guard and not leaving them blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not take a finger, and starts.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PLC
  • loops
  • robot cells
  • interlocks
  • commissioning
  • guards
  • cycle times
  • not jump the interlock

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

PLC programmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ladder, tags and the comment.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the fault and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
E-stop, the cable and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Recipe, the change and not dumping production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrician, the terminals and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it stops on a fault, and not jumping the e-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • tags
  • e-stops
  • faults
  • recipes
  • terminals
  • program comments
  • not jump e-stops

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 386Control engineer22%
  2. 387Corrosion engineer22%
  3. 388Instrumentation engineer22%
  4. 390Mining engineer22%
  5. 391Bridge engineer22%
  6. 392Commissioning engineer22%