IS WORK OVER?

Automation index

How much of a Mechatronics engineer’s job can AI already do?

A schematic comes earlier. The arm not taking a finger, and actually starting, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechatronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, the PLC and the loop.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the arm and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Commissioning, the interlock and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cycle, the time and not inflating the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the guard and not leaving them blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not take a finger, and starts.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PLC
  • loops
  • robot cells
  • interlocks
  • commissioning
  • guards
  • cycle times
  • not jump the interlock

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 381Ice-cream maker22%
  2. 382Hydrologist22%
  3. 383Agronomist22%
  4. 385Mining engineer22%
  5. 386Bridge engineer22%
  6. 387Commissioning engineer22%