IS WORK OVER?

Automation index

How much of a Mechatronics engineer’s job can AI already do?

A schematic comes earlier. The arm not taking a finger, and actually starting, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mechatronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, the PLC and the loop.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the arm and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Commissioning, the interlock and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cycle, the time and not inflating the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the guard and not leaving them blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not take a finger, and starts.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PLC
  • loops
  • robot cells
  • interlocks
  • commissioning
  • guards
  • cycle times
  • not jump the interlock

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 386Control engineer22%
  2. 387Corrosion engineer22%
  3. 388Instrumentation engineer22%
  4. 390Mining engineer22%
  5. 391Bridge engineer22%
  6. 392Commissioning engineer22%