Automation index
How much of a Medical secretary’s job can AI already do?
A clinic diary comes earlier. The patient going in and the record being there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Medical secretary
27%
AI can already do 27% of this job.
#205 / 743
View rankingMedical secretary
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diary, appointments and the DNA.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Record, the report and the missing one.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Phone, results and not giving them wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The doctor, the delay and not wrecking the waiting room.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Confidentiality and not talking in the corridor.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The patient goes in, and the record is there.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- clinic diary
- records
- results
- confidentiality
- waiting room
- medical appointments
- reports
- DNAs
Sources for this job· O*NET 43-6013.00· ESCO/ISCO 3344
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142